Please avoid the coned area in the parking area

Watch out for the marked area in the parking lot!

I used some of the parking lot funds to gather mixing tools and supplies to fill the holes. One 80lb bag of high strength concrete (recommended for driveways) almost filled one hole. It should be safe to walk on in 24 hours (11am 5/28) but takes 7 days to drive on and a total of 28 days to fully cure. I also bought a bag of asphalt patch to go over the concrete later this week.

Thank you to those who donated to this effort! If you’d like to see this happen at a faster pace, please consider donating to the Pothole Patch Fund currently in the break room.



3 Likes

Thank you for your help with this one John!

2 Likes